๐Ÿ—๏ธ Raft Zone A (Towards Completion)

๐Ÿ—๏ธ 1. Raft Zone A (Towards Completion)

The Raft Foundation works in Zone A are in the advanced stage and nearing completion. This phase involved bulk excavation, soil preparation, and compaction to achieve the required formation level. A comprehensive waterproofing system was installed to protect the foundation from groundwater ingress. Reinforcement steel was fixed as per structural drawings, followed by controlled concrete pouring using approved mix designs. Continuous supervision, testing, and curing activities are being carried out to ensure structural performance and durability.

Detailed Bullet Points:

  • ๐Ÿ› ๏ธ Bulk excavation carried out up to required depth and formation level

  • ๐Ÿ“ Subgrade preparation and compaction completed

  • ๐Ÿ’ง Waterproofing membrane and protective layers installed

  • ๐Ÿ”ฉ Reinforcement steel fixed, tied, and inspected as per approved shop drawings

  • ๐Ÿงฑ Concrete poured in controlled panels with vibration and finishing

  • ๐Ÿงช Concrete quality tests conducted (slump test, cube casting)

  • โณ Curing and surface protection works in progress

 