🏬 Lower Ground Floor Slab
The lower ground floor slab serves as a transition level between the basement and the upper floors and is designed to support both structural and functional loads. Shuttering and formwork systems were erected and checked for stability and alignment. Reinforcement steel was fixed as per approved drawings, and close coordination with MEP works ensured accurate placement of services. Concrete was poured with continuous monitoring of levels and thickness. De-shuttering and curing were carried out after achieving the required concrete strength.
Key Activities:
-
🪜 Shuttering and formwork installation completed
-
🔧 Reinforcement steel fixed and inspected
-
🔌 MEP sleeves, conduits, and openings coordinated
-
🧱 Concrete pouring completed under supervision
-
📏 Level and thickness checks performed
-
⏳ De-shuttering carried out after strength gain
-
💧 Curing and surface protection completed