🏢 Ground Floor Slab

The ground floor slab marks the beginning of the superstructure and defines the main commercial areas of the building. Construction involved erection of scaffolding, staging, and formwork systems capable of supporting construction loads. Reinforcement steel was placed with proper anchorage, and service openings were provided before casting. Concrete was poured and finished to achieve the specified surface levels, followed by curing and finishing works to ensure quality and durability.

Key Activities:

  • 🏗️ Scaffolding, staging, and formwork erected

  • 🔩 Reinforcement fixed as per approved drawings

  • 🧰 Service ducts, openings, and sleeves provided

  • 🧱 Concrete poured and leveled

  • 📐 Final surface level checks conducted

  • 💧 Curing and finishing works in progress