Construction

🚘 Ramp Construction

The ramp has been constructed to provide smooth and safe vehicular access between different levels of the building. Ramp alignment, slope gradient, and levels were set out accurately as per design requirements. Reinforcement and formwork were installed with attention to slope and load capacity. Concrete pouring was carried out with proper compaction, and anti-skid surface treatments were applied to enhance...

🏒 Ground Floor Slab

The ground floor slab marks the beginning of the superstructure and defines the main commercial areas of the building. Construction involved erection of scaffolding, staging, and formwork systems capable of supporting construction loads. Reinforcement steel was placed with proper anchorage, and service openings were provided before casting. Concrete was poured...

🏬 Lower Ground Floor Slab

🏬 Lower Ground Floor Slab The lower ground floor slab serves as a transition level between the basement and the upper floors and is designed to support both structural and functional loads. Shuttering and formwork systems were erected and checked for stability and alignment. Reinforcement steel was fixed as per approved drawings, and close coordination with MEP works ensured accurate placement of...

🏒 Basement Slab

The basement slab construction provides a durable and stable base for underground parking and service areas. Prior to concrete casting, the base surface was cleaned, leveled, and prepared to ensure uniform thickness. A waterproofing membrane was applied to prevent moisture penetration. Reinforcement steel was installed with correct laps and cover, and all embedded services and sleeves were coordinated...

🧱 Retaining Wall – Zone A

🧱 Retaining Wall – Zone A The retaining wall in Zone A has been constructed to provide lateral support to the surrounding soil and ensure stability of the basement and foundation areas. The construction process included excavation along the wall alignment, installation of formwork systems, and fixing of reinforcement steel as per structural design. Concrete was placed in a controlled manner with...

πŸ—οΈ Raft Zone A (Towards Completion)

πŸ—οΈ 1. Raft Zone A (Towards Completion) The Raft Foundation works in Zone A are in the advanced stage and nearing completion. This phase involved bulk excavation, soil preparation, and compaction to achieve the required formation level. A comprehensive waterproofing system was installed to protect the foundation from groundwater ingress. Reinforcement steel was fixed as per structural drawings,...

🚧 Excavation – Ravi Business Center

The development of Ravi Business Center has reached an important milestone as the excavation and site cleaning phase is now successfully completed. This crucial stage sets the foundation for all upcoming structural activities and reflects the project team’s commitment to precision, safety, and timely progress. To ensure quality and long-term structural stability, the excavation work was carried out...

🚧 Excavation Milestone Achieved – Ravi Business Center

Major Excavation Milestone Successfully Achieved The excavation phase at Ravi Business Center has been completed with precision, marking a key step forward in the project’s development.Key highlights include: Execution of deep excavation as per approved engineering drawings Use of advanced surveying tools for accurate depth and boundary control Continuous soil testing to ensure...